| Country house in the Moscow region |
| Current consumption =15kW |
| Guest annex/sauna has been built |
| Swimming pool + boiler room = 3.5 kW: |
| Ventilation + Air conditioners = 5 kW; |
| kitchen equipment == 7 kw; |
| Sauna = 10.5 kW - 3x16A automatic; |
| + lighting and appliances.=3kW |
| Total=29kW |
| Required work: replacement of the underground cable with a cable of a larger cross section 0.7 km |
| The estimated cost of work to increase capacity in MOESK was about 1,300,000 rubles. |


