Office building in EU
Additional 30kw required.
The average cost of connecting one kilowatt, including all additional fees, is about 3 tons per sq. t. only 15 kW connection is required.
• Connection 30 kw.
• Connection 15 kw.
Ebuilding System
The savings from the implementation of the Ebuilding system is 15,400,00 EU